Gable Extension Floor Boards

September 28, 2010 § Leave a comment

Gable Extension Bedroom Renovation Wayne Main Line Philadelphia PA
Wrapping up framing for the gable extension and installing floor boards.

Master Bath Floor Boards

September 27, 2010 § Leave a comment

Master Bath Renovation Wayne Main Line Philadelphia PA
Master Bath Floor Board Installed

Tub Deck Framing

September 17, 2010 § Leave a comment

Master Bath Renovation Framing Soaking Tub Wayne Main Line Philadelphia
The tub deck has been framed out in the master bath.

Framing the Gable Extension

September 17, 2010 § Leave a comment

Addition and Renovation Framing Construction Wayne Main Line Philadelphia PA
Gable Extension Addition Construction Wayne Main Line Philadelphia

Shed Dormer Framing for Driveway Side Bedroom

September 17, 2010 § Leave a comment

Shed Dormer Addition Framing Wayne Main Line Philadelphia

Driveway Side Bedroom Demo for Dormer Addition

September 10, 2010 § Leave a comment

Shed Dormer Addition Wayne Main Line Philadelphia PA

Demolition for Gable Extension

September 10, 2010 § Leave a comment

Gable Extension Renovation Wayne PA
The existing rear gable has been removed so that a new longer gable can be framed.
Demolition Phase Gable Extension Wayne PA
The middle bedroom has been completely removed.

Bedroom Addition Framed Out

September 10, 2010 § Leave a comment

Bedroom Addition Construction Wayne Main Line Philadelphia
Bedroom addition framed out. View towards front of house.
Bathroom Addition Renovation Framing Wayne Main Line PA
New bathroom framed out at the entrance to the new bedroom.

Master Bath Plumbing

September 1, 2010 § Leave a comment

Master Bath Renovation Copper Plumbing Pipes Wayne Main Line Philadelphia PA
Inside the master bath, the floor has been removed since we saw it last. Also note that the plumber has been here. New copper pipes run along the right side wall where the new vanity will sit. Also on the wall facing us, to the right of the window (for the shower).

Exterior Sheathing

September 1, 2010 § Leave a comment

Exterior Sheathing Addition Construction Wayne Main Line Philadelphia PA
The addition is now protected by Green ZIP System sheathing panels that resist moisture better than ordinary plywood. Same thing on the roof, but slightly thicker and coated in red so installers can separate it from wall sheathing.

Shed Dormer Addition Construction Renovation Wayne Main Line Philadelphia PA
Inside the pool side bedroom, site workers carefully cut out the opening for the new shed dormer.

Where Am I?

You are currently viewing the archives for September, 2010 at Biddulph Road.