Second Floor Interior Before Renovation

August 6, 2010 § Leave a comment

Second Floor Renovation Wayne Main Line Philadelphia PA
Stairs to Second Floor Before Renovation. The second floor will be stripped to the studs before construction begins. The reconfigured floorplan will address ceiling height issues and give each space a little more breathing room.

Renovation Bedroom Addition Wayne Main Line Philadelphia PA
Play Room Area at Top of Stairs. The bedroom addition will connect to the existing structure along the (front) wall with the window. Most of this space will be consumed by the new bathroom.

Bedroom Before Renovation Dormer AdditionWayne Main Line Philadelphia PA
Pool Side Bedroom View towards Stairs. A new shed dormer and window unit will replace the skylight in the pool side bedroom to raise the roof line and provide a little more space. The existing doorway will be moved to the right and basically switch places with the closet.

Bedroom Before Renovation Wayne Main Line Philadelphia PA
Right now we’re standing at the top of the stairs looking into the middle room at the back of the house. This room will be opened up to create an open play area central to all the new bedrooms. The space will be shared by the den/playroom and rear middle bedroom.

Bedroom Before Renovation Wayne Main Line Philadelphia PA
Existing Rear Middle Bedroom. The back wall (to our left) will be knocked out and the gable extended to add a little space for the bedroom.

New shed dormers in the driveway side bedroom (not pictured) will raise the roofline to provide vertical clearance.

Bath Before Renovation Wayne Main Line Philadelphia PA
The existing bathroom structure will be extended slightly, but will benefit mostly from new fixtures and finishes.

Advertisements

First Floor Interior Before Renovation

August 6, 2010 § Leave a comment

Before Renovation Office Addition Wayne Main Line Philadelphia PA
The office addition will connect to the existing structure at this wall. The windows will be infilled with the entrance to the office located towards the end of the wall on the right.

Master Suite Renovation and Addition Wayne Main Line Philadelphia PA
View from Front Wall of Master Bedroom towards Rear. The office addition will sit on the right side of this wall. The new closet will be incorporated into the new addition with the entrance at the far end on the right.

Closet Before Renovation Wayne Main Line Philadelphia PA
Existing Master Closet. The existing closet will be part of a new larger master bath. The new bathtub will be located under the window straight ahead.

Master Bath Before Renovation Wayne Main Line Philadelphia PA
Existing Master Bath. The renovation plan calls for a new vanity with a private toilet room beyond.

Exterior Before Renovation

August 5, 2010 § Leave a comment

Before Renovation and Addition Wayne Main Line PA

Front of house before renovation.

Before Renovation and Addition Wayne Main Line PA

We’ll be adding another story and a half in this corner.

Before Renovation and Addition Wayne Main Line PA

The pool side exterior before renovation.

Before Renovation Wayne PA

Rear corner of house on pool side before renovation. New windows and dormers on this side.

Before Renovation and Addition Wayne Main Line PA

Driveway side before renovation

Second Floor Plans

August 3, 2010 § Leave a comment

Office Addition Renovation Wayne Main Line Philadelphia PA

Existing Conditions Second Floor.

Second Level Addition Floor Plan Reconfigure Wayne Main Line Philadelphia PA

Architectural Second Floor Plan. In the reconfigured floorplan, the two side bedrooms remain mostly intact. The existing bathroom to the left of the stairs benefits from all new finishes. A new bath will take the place of the existing front bedroom with a new bedroom addition above the new office. A gable extension at the rear of the house will accommodate a fourth bedroom. The entire second floor centers on a den/playroom for the kids.

First Floor Plans

August 3, 2010 § Leave a comment

Second Story Office Addition Wayne PA

Existing Conditions: First Floor Plan

Second Story Office Addition Wayne PA

Architectural: First Floor Plan. We’re adding an office adjacent to the master suite with walk-out French doors. The existing closet space will become part of the new master bath. A walk-in closet will be incorporated into the new addition.

Side Elevations (Driveway)

August 3, 2010 § Leave a comment

Exterior Renovation Addition Dormer Wayne Main Line Philadelphia

Existing Driveway Side Elevation.

Exterior Renovation Addition Dormer Wayne Main Line Philadelphia

Architectural Side Elevation. The dormer above the side entry will be extended and new windows will update the facade.

Rear Elevations

August 3, 2010 § Leave a comment

Shed Dormer Addition Renovation Wayne Main Line Philadelphia PA

Existing Rear Elevation. The screened porch will be closed in and the gable on the left will be bumped out.

Shed Dormer Addition Renovation Wayne Main Line Philadelphia PA

A new shed dormer will mirror the shed dormer on the right. The left gable will be extended and new windows will be installed.

Where Am I?

You are currently viewing the archives for August, 2010 at Biddulph Road.