In the Office During Framing

August 23, 2010 § Leave a comment

Office Addition Framing Wayne Main Line Philadelphia PA
Walking in the doorway to the office addition

Office Addition Construction Wayne Main Line Philadelphia PA
Inside the office in front of the large window overlooking the front yard.

Office Addition Construction Wayne Main Line Philadelphia PA
A couple of steps lead into the master suite.

Master Closet Office Addition Construction Wayne Main Line Philadelphia PA
View through the back wall of the new master closet and out the opening for the new French doors.

Framing the Roof

August 23, 2010 § Leave a comment

Framing Construction Renovation Addition Wayne Main Line Philadelphia PA
Framing the Second Level and Roof of the Addition

Site workers pass lumber through the existing dormer window as framing continues on the second level.

Second Floor Stripped

August 13, 2010 § Leave a comment

Playroom Bedroom Addition Floor Plan Reconfigure Renovation Wayne Main Line Phila PA
Playroom stripped down to the studs.

Bedroom Renovation Dormer Addition Wayne Main Line Philadelphia
Pool Side Bedroom View Towards Stairs

Demolition Construction Renovation Bedroom Main Line Philadelphia PA
Rear Middle Bedroom with Interior Wall Removed

Floorplan Reconfigure Renovation Wayne Main Line Philadelphia PA Construction
Driveway Side Bedroom View to Rear. We didn’t see this room before it was stripped. The renovation will address some of the awkward angles.

Bedroom Renovation Construction Low Ceiling Main Line Philadelphia
Driveway Side Bedroom View to Stair

Bathroom Renovation Construction Wayne Main Line Philadelphia PA
Bathroom Gutted

Master Bath Gutted

August 13, 2010 § Leave a comment

Master Bath Renovation Construction Wayne Main Line Philadelphia PA
All fixtures and finishes removed from the existing master bath.

Master Suite Renovation Office Addition Master Closet Master Bath Renovation Construction Wayne Main Line Philadelphia PA
One wall of the master bedroom has been stripped in preparation for the new closet and office doorway.

Tieing in the Addition

August 13, 2010 § Leave a comment

Office Addition Construction Main Line Philadelphia PA
The existing windows were removed and the wall was reframed to tie-in the office addition. To the left, metal studs support a temporary wall that separates the construction area from the rest of the house.

Framing Continues

August 13, 2010 § Leave a comment

Second Story Office Addition Wayne Main Line Philadelphia PA
Here’s a better look at the addition as framing continues.

Framing the Addition

August 12, 2010 § Leave a comment

Framing Addition Wayne Main Line Philadelphia
Today a light drizzle quickly progressed into a drenching downpour. A giant tarp prevents the rain from saturating the interior spaces.

Framing Addition Wayne Main Line Philadelphia
Site workers stripped the roof from the lower level and began framing the addition above.

Second Floor Interior Before Renovation

August 6, 2010 § Leave a comment

Second Floor Renovation Wayne Main Line Philadelphia PA
Stairs to Second Floor Before Renovation. The second floor will be stripped to the studs before construction begins. The reconfigured floorplan will address ceiling height issues and give each space a little more breathing room.

Renovation Bedroom Addition Wayne Main Line Philadelphia PA
Play Room Area at Top of Stairs. The bedroom addition will connect to the existing structure along the (front) wall with the window. Most of this space will be consumed by the new bathroom.

Bedroom Before Renovation Dormer AdditionWayne Main Line Philadelphia PA
Pool Side Bedroom View towards Stairs. A new shed dormer and window unit will replace the skylight in the pool side bedroom to raise the roof line and provide a little more space. The existing doorway will be moved to the right and basically switch places with the closet.

Bedroom Before Renovation Wayne Main Line Philadelphia PA
Right now we’re standing at the top of the stairs looking into the middle room at the back of the house. This room will be opened up to create an open play area central to all the new bedrooms. The space will be shared by the den/playroom and rear middle bedroom.

Bedroom Before Renovation Wayne Main Line Philadelphia PA
Existing Rear Middle Bedroom. The back wall (to our left) will be knocked out and the gable extended to add a little space for the bedroom.

New shed dormers in the driveway side bedroom (not pictured) will raise the roofline to provide vertical clearance.

Bath Before Renovation Wayne Main Line Philadelphia PA
The existing bathroom structure will be extended slightly, but will benefit mostly from new fixtures and finishes.

First Floor Interior Before Renovation

August 6, 2010 § Leave a comment

Before Renovation Office Addition Wayne Main Line Philadelphia PA
The office addition will connect to the existing structure at this wall. The windows will be infilled with the entrance to the office located towards the end of the wall on the right.

Master Suite Renovation and Addition Wayne Main Line Philadelphia PA
View from Front Wall of Master Bedroom towards Rear. The office addition will sit on the right side of this wall. The new closet will be incorporated into the new addition with the entrance at the far end on the right.

Closet Before Renovation Wayne Main Line Philadelphia PA
Existing Master Closet. The existing closet will be part of a new larger master bath. The new bathtub will be located under the window straight ahead.

Master Bath Before Renovation Wayne Main Line Philadelphia PA
Existing Master Bath. The renovation plan calls for a new vanity with a private toilet room beyond.

Exterior Before Renovation

August 5, 2010 § Leave a comment

Before Renovation and Addition Wayne Main Line PA

Front of house before renovation.

Before Renovation and Addition Wayne Main Line PA

We’ll be adding another story and a half in this corner.

Before Renovation and Addition Wayne Main Line PA

The pool side exterior before renovation.

Before Renovation Wayne PA

Rear corner of house on pool side before renovation. New windows and dormers on this side.

Before Renovation and Addition Wayne Main Line PA

Driveway side before renovation