In the Office During Framing

August 23, 2010 § Leave a comment

Office Addition Framing Wayne Main Line Philadelphia PA
Walking in the doorway to the office addition

Office Addition Construction Wayne Main Line Philadelphia PA
Inside the office in front of the large window overlooking the front yard.

Office Addition Construction Wayne Main Line Philadelphia PA
A couple of steps lead into the master suite.

Master Closet Office Addition Construction Wayne Main Line Philadelphia PA
View through the back wall of the new master closet and out the opening for the new French doors.

Framing the Roof

August 23, 2010 § Leave a comment

Framing Construction Renovation Addition Wayne Main Line Philadelphia PA
Framing the Second Level and Roof of the Addition

Site workers pass lumber through the existing dormer window as framing continues on the second level.

Second Floor Stripped

August 13, 2010 § Leave a comment

Playroom Bedroom Addition Floor Plan Reconfigure Renovation Wayne Main Line Phila PA
Playroom stripped down to the studs.

Bedroom Renovation Dormer Addition Wayne Main Line Philadelphia
Pool Side Bedroom View Towards Stairs

Demolition Construction Renovation Bedroom Main Line Philadelphia PA
Rear Middle Bedroom with Interior Wall Removed

Floorplan Reconfigure Renovation Wayne Main Line Philadelphia PA Construction
Driveway Side Bedroom View to Rear. We didn’t see this room before it was stripped. The renovation will address some of the awkward angles.

Bedroom Renovation Construction Low Ceiling Main Line Philadelphia
Driveway Side Bedroom View to Stair

Bathroom Renovation Construction Wayne Main Line Philadelphia PA
Bathroom Gutted

Master Bath Gutted

August 13, 2010 § Leave a comment

Master Bath Renovation Construction Wayne Main Line Philadelphia PA
All fixtures and finishes removed from the existing master bath.

Master Suite Renovation Office Addition Master Closet Master Bath Renovation Construction Wayne Main Line Philadelphia PA
One wall of the master bedroom has been stripped in preparation for the new closet and office doorway.

Tieing in the Addition

August 13, 2010 § Leave a comment

Office Addition Construction Main Line Philadelphia PA
The existing windows were removed and the wall was reframed to tie-in the office addition. To the left, metal studs support a temporary wall that separates the construction area from the rest of the house.

Framing Continues

August 13, 2010 § Leave a comment

Second Story Office Addition Wayne Main Line Philadelphia PA
Here’s a better look at the addition as framing continues.

Framing the Addition

August 12, 2010 § Leave a comment

Framing Addition Wayne Main Line Philadelphia
Today a light drizzle quickly progressed into a drenching downpour. A giant tarp prevents the rain from saturating the interior spaces.

Framing Addition Wayne Main Line Philadelphia
Site workers stripped the roof from the lower level and began framing the addition above.

Where Am I?

You are currently viewing the archives for August, 2010 at Biddulph Road.